Following scaffolding inspection requirements are key to ensuring safety when working at height. Therefore, it is of paramount importance that inspections are carried out correctly. At safetime® , we are often asked questions regarding the requirements for scaffolding inspections, such as: “How often does a scaffold need to be inspected?”


When?

Scaffolding inspections should be carried out on site at regular intervals and that they are undertaken by a competent person. The Work at Height Regulations 2005 state that scaffolding should be inspected:

  • After installation/before it is used for the first time
  • At intervals of at least every seven days following installation
  • Following any circumstances which could compromise the safety of the scaffolding, such as adverse weather conditions

(All of which are recognised by the Inspect7® system, with notifications being sent at the relevant times for required inspections)

Who? 

Scaffolding inspections should always be conducted by a qualified and competent person. The person conducting the inspection should always have a suitable level of experience.

The Construction Industry Scaffolders Registration Scheme (CISRS) is able to assess those wishing to be able to inspect scaffolding in order to declare them competent. 

At safetime® we evaluate every user using the Construction Industry Training Board, known as CITB. The CITB’s Online Card Checker allows us to check a card and also test details for any scheme membership and test administered by CITB. This ensures that every inspector using Inspect7® is fully qualified and competent enough to carry out a scaffold inspection.

Scaffolding Inspection Requirements:

The following information should be included in every scaffolding inspection report:

  • Name and address of the person who carried out the inspection and their position
  • The location, date and time
  • A description of the place where the scaffold was inspected
  • Details of defects or anything identified during the inspection that could pose a risk to the health or safety of any person and any action to be taken
  • Details of any further action considered necessary

Once an inspection has been carried out using Inspect7®, all of this information is recorded and immediately synced with the online portal. This can then be accessed and viewed online in real time by anyone who needs access. A digital copy of the inspection report can be generated and downloaded in a few clicks. 

Book Demo

Previous post
Next post

Related articles

August 30, 2023

Introducing Guest Access: No Account? No Problem!

Here at SafeTime, we always strive to enhance the experience for our users. We’re excited to share an update to…

Read More
December 7, 2022

Don’t Risk It: The Essential Guide to Scaffold Inspections

In construction, scaffolding is an essential tool that allows workers to safely access high areas. Scaffolds are typically temporary structures…

Read More
January 14, 2022

Harness Inspections solved with Safetime®

Working in a safe environment should be number one priority for all businesses that deal with any type of risk…

Read More

Book your free demo of Inspect7

For a free, no obligation demo of the Inspect7 system click on the button below.

Book demo